Wuxi Yushun Metallurgical Technology Co., Ltd.

Wuxi Yushun Metallurgical Technology Co., Ltd.

Manufacturer from China
Verified Supplier
5 Years
Home / Products / Steelmaking Electric Arc Furnace /

AC Steelmaking Electric Arc Furnace for Manufacturing plant

Contact Now
Wuxi Yushun Metallurgical Technology Co., Ltd.
Visit Website
City:wuxi
Province/State:jiangsu
Country/Region:china
Contact Person:MrHuang
Contact Now

AC Steelmaking Electric Arc Furnace for Manufacturing plant

Ask Latest Price
Video Channel
Brand Name :Yushun
Model Number :Customized
Certification :ISO 9001
Place of Origin :Jiangsu, China
MOQ :1 set
Price :Negotiated
Payment Terms :L/C, T/T
Supply Ability :Negotiated
Delivery Time :30 days
Packaging Details :normal package naked or pack it according to customers' request
Name :Electric Arc Furnace Steel Smelting
Specification :Customized
Condition :New
Apply :Manufacturing plant
Usage :Melting furnace
Power type :AC arc furnace
Melting material :Ferrous
Weight :Customized
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Electric Arc Furnace Steel Smelting

AC Steelmaking Electric Arc Furnace for Manufacturing plant

1. Electric arc furnace is used to scrap melting, taking of the C/P/S/O, and molten steel heating, etc. It is applied to melting steel of different grades and components.

2. It can be put off the material of iron mix C, iron alloy, DRI and HBI when it is working.

3. Additional charging during the melting process and primary alloying process.

Specification for 25 ton EAF
Engine Engine power Kw/rpm 1300/2150
Power type AC/DC AC
Furnace capacity(tons) T 10-220t
Transformer Main capacity transformer Km/h 10
Peak current of electrode (max.) KA ≤20
Range of rectified voltage V 0-800
Other system PLC system
Power supply
Dust removal equipment

Function

1. Used for scrap melting, decarbonization, dephosphorization, desulfuration, deoxygenation and molten steel heating, etc. For melting steel of different grades and components.

2. Partial hot metal charging or charging pig iron, sponge iron(DRI) and hot briquetted iron(HBI).

3. Additional charging during the melting process and primary alloying process.

Main Features

1. Refractory material saving due to the water cooled roof and water cooled panels.

2. Slag less tapping and tapping temperature reducing result from EBT.

3. Impendence of large current reducing due to the copper and steel composite conductive arm and large section water cooled cable.

4. Power consumption for per ton of steel and smelting period are reduced due to adopting furnace door C-O lance and furnace wall coherent oxygen lance.

5. Fume collection rate is increasing due to adopting furnace roof fourth hole and other fume discharging methods.

6. Scrap steel continuous charging and preheating system could applied thus saving energy, reduce consumption and improve smelting efficiency.

7. Raw material(DRI/HBI), lime and alloy automatic charging system could be equipped.

8. Equipped with advance PLC control system and smelting model.


AC Steelmaking Electric Arc Furnace for Manufacturing plant
AC Steelmaking Electric Arc Furnace for Manufacturing plant

AC Steelmaking Electric Arc Furnace for Manufacturing plant

AC Steelmaking Electric Arc Furnace for Manufacturing plant

AC Steelmaking Electric Arc Furnace for Manufacturing plant

AC Steelmaking Electric Arc Furnace for Manufacturing plant

AC Steelmaking Electric Arc Furnace for Manufacturing plant

AC Steelmaking Electric Arc Furnace for Manufacturing plant

AC Steelmaking Electric Arc Furnace for Manufacturing plant

Selling Units: Single item

Single package size: 150*100*170cm

Single gross weight: 100,000kg

Package Type: Safety Seaworthy Package

Lead Time:

Quantity (Tons) 1-100 >100
Est. Time(Days) 60 To be negotiated

Inquiry Cart 0